Thread: Commit Charge
View Single Post
Old October 3rd, 2005, 03:06 PM   Digg it!   #1 (permalink)
foxyreign
Member
 
foxyreign's Avatar
 
Join Date: Sep 2005
Location: Manila, Philippines
Posts: 53
Send a message via ICQ to foxyreign Send a message via AIM to foxyreign Send a message via MSN to foxyreign Send a message via Yahoo to foxyreign
Commit Charge

I have problems with my page file optimization.

total physical memory is 1048044
available is 474700 (varies)
system cache is 6463308 (varies)

commit charge total is 425552 (varies)
commit charge limit is 5730900
commit charge peak is 434084

when i use photoshop or corel draw or view images and pages in acro reader, the commit charge total exceeds the commit charge peak, but the peak doesnt reach total physical memory. thus, it delays processing of the program im using (not the whole system).

how can i increase the value of my commit charge peak?
__________________
Intel Pentium 4 3.0GHZ Prescott w/ HT
Foxconn 865 Series MB
Nvidia GeForce FX5500 256MB
2x512MB DDR PC400
TASK 450watts PS
120GB HD

Last edited by foxyreign : October 3rd, 2005 at 03:17 PM. Reason: Page File Optimization
foxyreign is offline   Reply With Quote
Search TechIMO for Answers: